bLiNdz0r's Mjolnir Helmet Progress

Status
Not open for further replies.

bLiNdz0r

New Member
bLiNdz0r's Mjolnir Pepakura Helmet Thread
Start date: October 10th
Finishing date: October 30th, (if not before) estimate
__________________________________________________________________​

Phases:
Printing: X - completed!
Cutting: X - completed!
Glueing: X - completed!
Resining: X - completed!
Fibreglassing: X - completed!
Bondo: X - 50%!
Details: X - 20%!
Painting: 0%!

_____________________________________________________
PHOTOBUCKET LINK (all Helmet Pictures in a SLIDESHOW): HERE

Updates/Notes:
- Going to buy a Mouse Sander tomorrow, jesus bondo takes forever to sand.
- After I sand the top, going to start bondoing the bottom.
- Small repairs to rips in places I didn't get enough resin/fibreglass on.
- Hopefully atleast done the helmet before Halo-ween (;)), I know the actual full Mjolnir suit will not be complete.

_____________________________________________________


-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 10th 2007

Events:
- All pieces cut out and folded

Main picture:
10-10-07_2050.jpg

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 11th 2007

Events:
- Construction of helmet finished

Main picture:
11-10-07_1744.jpg

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 12-15th 2007

Events:
- All supplies bought

Main picture:
12-10-07_1838.jpg

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 16th 2007

Events:
- Resin finished inside/outside, done both coats.

Main picture:
16-10-07_2108.jpg

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 17th 2007

Events:
- Fibreglassing finished.

Main picture:
16-10-07_1625.jpg

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 22nd-23rd 2007

Events:
- Bondo 50% completed

Main picture:
22-10-07_2044.jpg

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​

-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 23rd 2007

Events:
- Bondo partly sanded (the parts that have been bondo'd)
- Vents cut out and led placement cut out

Main picture 1 (bondo):
23-10-07_2052.jpg


Main picture 2 (vents etc):
23-10-07_2128.jpg


-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-​
 
Last edited by a moderator: