bLiNdz0r's Mjolnir Pepakura Helmet Thread
Start date: October 10th
Finishing date: October 30th, (if not before) estimate
__________________________________________________________________
Start date: October 10th
Finishing date: October 30th, (if not before) estimate
__________________________________________________________________
Phases:
Printing: X - completed!
Cutting: X - completed!
Glueing: X - completed!
Resining: X - completed!
Fibreglassing: X - completed!
Bondo: X - 50%!
Details: X - 20%!
Painting: 0%!
_____________________________________________________
PHOTOBUCKET LINK (all Helmet Pictures in a SLIDESHOW): HERE
Updates/Notes:
- Going to buy a Mouse Sander tomorrow, jesus bondo takes forever to sand.
- After I sand the top, going to start bondoing the bottom.
- Small repairs to rips in places I didn't get enough resin/fibreglass on.
- Hopefully atleast done the helmet before Halo-ween (
), I know the actual full Mjolnir suit will not be complete.
_____________________________________________________
PHOTOBUCKET LINK (all Helmet Pictures in a SLIDESHOW): HERE
Updates/Notes:
- Going to buy a Mouse Sander tomorrow, jesus bondo takes forever to sand.
- After I sand the top, going to start bondoing the bottom.
- Small repairs to rips in places I didn't get enough resin/fibreglass on.
- Hopefully atleast done the helmet before Halo-ween (
_____________________________________________________
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 10th 2007
Events:
- All pieces cut out and folded
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 10th 2007
Events:
- All pieces cut out and folded
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 11th 2007
Events:
- Construction of helmet finished
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 11th 2007
Events:
- Construction of helmet finished
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 12-15th 2007
Events:
- All supplies bought
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 12-15th 2007
Events:
- All supplies bought
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 16th 2007
Events:
- Resin finished inside/outside, done both coats.
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 16th 2007
Events:
- Resin finished inside/outside, done both coats.
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 17th 2007
Events:
- Fibreglassing finished.
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 17th 2007
Events:
- Fibreglassing finished.
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 22nd-23rd 2007
Events:
- Bondo 50% completed
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 22nd-23rd 2007
Events:
- Bondo 50% completed
Main picture:
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 23rd 2007
Events:
- Bondo partly sanded (the parts that have been bondo'd)
- Vents cut out and led placement cut out
Main picture 1 (bondo):
Main picture 2 (vents etc):
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
October 23rd 2007
Events:
- Bondo partly sanded (the parts that have been bondo'd)
- Vents cut out and led placement cut out
Main picture 1 (bondo):
Main picture 2 (vents etc):
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-
Last edited by a moderator: