Crusader1080 Member Singapore Regiment Mar 28, 2022 #21 Progress Update 10 Finished the decal and Velcro's installation on the top case and the entire rocket assembly. The Velcro installtion The assembled SPNKr Attachments 20220328_152311439_iOS.jpg 1.7 MB · Views: 133 20220328_152302040_iOS.jpg 1.7 MB · Views: 140 20220328_152111124_iOS.jpg 2.6 MB · Views: 146 20220328_151404832_iOS.jpg 1.9 MB · Views: 130 20220328_142205248_iOS.jpg 2.6 MB · Views: 141
Progress Update 10 Finished the decal and Velcro's installation on the top case and the entire rocket assembly. The Velcro installtion The assembled SPNKr