Here is a link to a Google Drive folder to upload pictures from the build day :
Drive Link
Thank you to everyone who had showed up for the first build day for the booth. I'm glad we could finally take the step to host a get together that went so well despite the heat! Such a good time having everyone come over, Amazing progress all around.
After some photos are put in the drive, I'll give a more detailed update on what was done and how but, the short of it is we've assembled (8) wall supports, (6) walls, (2) half walls. Up next is to rig it all together and paint!
Materials will be gathered for paint soon!
Lastly we'll need to hash out the next build date for August. I recall the 15th doesn't work for Cacti, and the 9th doesn't work for LadyRed and I, so leaning more towards the end of that month. Which if that goes as well as yesterday, then we'll be in a great spot. After our August build day, we'll likely try for one more date before CGC (09/19 - 09/21) as an assembly day perhaps, we'll see after the next. (Progress can continue outside of a build day pending our availability).
Slightly off topic, but if there are any improvements to our space you can think of that we can make for the next build date or get together, please feel free to share! I'd like to have the garages in a good spot where all are comfy and enjoy being when we're working on projects. I know a mini fridge was tossed around, which we may have that covered.
Thanks again guys, great work!
Attendees:
LadyRedCos
Wayward Flood
Negativecacti
N8TEBB
SoleofDeath
FuriousFido
marinesniper