thanks for the interest ill post the floor plans when i can.
as far as the trailer goes its just a teaser, like the spiderman teasers. i know it pisses people off i expected especially with the music it always gets people going. dont fret though the suit is in the mail and should be put together in about a weeks time. after that we are going to the desert to shoot an actual trailer.
i agree 110 percent with film however you gotta understnad budgeting and it cost 175 dollars an hour to telecine film with a minimum of 1hour of work involved.
it takes about 1000feet of film with little color corection to do the transfer per hour. when you go scene by scene color correction instead of just one correction at the beginning of the filmstrip it can take even longer.
this film will require about 6000 ft of film costing around 450 dollars is bad, but the telecine will cost about 1050 if it is about 6 hours of work. granted this is estimated but im telling you my estimates are cheap. this would cost more.
now that is only for the film. sets, props, costumes, and planning is costing about 3000 alone.
That is why we are shooting HD. Its easier to shoot and looks great. And if we got enough attention we will do a film transfer so then it will have the film look we all so very much want.
Its an expensive business and we are well on our way to making this happen. Planning is looking great props and costuems are looking great. We got approval to use are school studio and equipment not to mention school ground as a storage facility for our sets. Its looing really great right now.
In two weeks i have a meeting with the set design classes to talk about the building of our sets.
So I hope that answeres some questions and brings up some new ones.
Peace for now.